SC 9 bridge over Broad River reopens in Union Co.

News
SC 9 bridge repair deck view_223746

LOCKHART, SC (WSPA) – The SCDOT says they are reopening the SC 9 bridge over the Broad River at 4pm. They say bridge repairs were completed 2 weeks ahead of schedule.

The Department of Transportation says the bridge was closed for repairs on July 18th and they had originally scheduled repairs to be complete on August 14.

A 35-mile detour was in place during the project which installed new beams and concrete patches to strengthen the bridge.

A new bridge is scheduled to be built next to the existing bridge. The project will be put out for bids by the end of 2016.

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Trending Stories

Home for the Holidays
Color Your Weather
Pro Football Challenge
wspa news app free for download choose your store below
download the wspa news app from the apple app store
download the wspa news app from the google play store